Construction Business Memo - Sample

            

             As a representative for ----- Construction, I am very pleased to offer our.

             proposal for the new --------------------- Building Project. The contract.

             value for this project will be for a guaranteed maximum price of $). .

             All work will be completed as required in the modified.

             General Conditions and the Standard Form of Agreement for a Guaranteed.

             Maximum Price Contract document.

             ----- Construction has great interest in this project because it is a design.

             of steel base construction we are familiar with. The design is ambitious.

             and will be a great addition to the ----- campus. We are familiar with this.

             type of space frame, base isolation design as it was recently implemented.

             in the ------ Lab project for which we were the General.

             Contractor-Construction Manager. This project was successful through the.

             involvement of the construction management team in the preconstruction.

             process. A constant exchange of ideas determined the best fabrication and.

             erection practices and team members were able to agree upon major cost and.

             constructability issues. We propose for this project with the stipulation.

             that we are highly involved in preconstruction process.

             On a site with such grade slope, shoring, erection and accessibility are.

             complex issues that require strategic planning. Our project and field.

             teams understand base isolator design constructability and will be able to.

             efficiently and safely implement the product per the desired outcomes of.

             our client and the designer.

             To prepare to build a facility being constructed on a narrow steep slope.

             between a road and adjacent buildings we will need to grub and clear the.

             hillside, construct a retaining wall and begin excavation for the concrete.

             pier foundations. This ensures the safety of the general public using the.

             road and will provide the stability needed in a steep hillside. -----.

             Construction will anticipate and schedule crane picks of steel and material.

             to mitigate partial road closures.